St. Louis Roofing & Exterior Construction
From the Ground Up
The same planning, documentation and standards we bring to roofing, applied to the whole build. Scroll the sequence, stage by stage.










A home, built
Ground to finish, stage by stage.
Stage 1 / 10
Site Preparation
Grading, access, drainage and layout establish the conditions for everything that follows.
Built as a system, documented at every stage
From the first survey stake to the final trim, each phase is planned, sequenced and inspected before the next one covers it. That's how you get a home that performs — not just one that looks finished.
What each phase covers
- Site preparation — grading, access, drainage and layout
- Foundation — footings, walls, waterproofing and drainage
- Floor system — engineered joists, beams and subfloor
- Framing — walls, roof geometry and load paths
- Roofing system — deck, underlayment, flashing, shingles and ventilation
- Exterior envelope — windows, brick and siding
- Mechanical rough-in — plumbing, electrical and HVAC, inspected
- Insulation & drywall — comfort and efficiency
- Interior finishes — cabinetry, stone, flooring and trim
The images above are rendered illustrations of the construction process, shown to explain how a build progresses — not a specific completed project. Real Loxley project photos live on Our Work.
Planning a build or addition? Let's talk.
Tell us what you're planning. We'll walk the site, talk through scope and budget, and give you a clear, documented path from the ground up.